top of page
Search


Sarens appointed to carry out the upgrade of the Atlantic Canada Bulk Terminal in Sydney to adapt it as a strategic hub for offshore wind
The port, which features a 350-meter (1,170-foot) berthing quay and over 44 hectares (110 acres) of land for component marshalling, is already a strategic stopover point for offshore wind projects in the northeast of the continent. It is currently considered one of the top 10 key ports for the North American offshore industry. Sarens has successfully bridged the gap between legacy breakbulk site and the future of offshore wind. By applying specialized lifting methodologie
Apr 213 min read


Sarens carries out heavy lifting operations as part of the annual maintenance at a Petrochemical Facility in Beaumont, Texas
An AC5250 all-terrain crane, with a maximum lifting capacity of 250 tons, was ultimately selected as the primary crane, supported by AC130 and GMK4090 units. This equipment was chosen based on the job requirements, offering a combination of high load capacity, operational flexibility, and compact dimensions Thanks to the proximity of the Sarens depot in Beaumont, equipment mobilization was highly efficient, with the cranes transported to the site in approximately 15 minutes a
Apr 172 min read
bottom of page
